The Asset Identification Code (AIC) system provides classification of assets according to task, type, and location. Asset identifiers...
Forms & Documents
- 0 (6) Apply 0 filter
- 2 (1) Apply 2 filter
- A (15) Apply A filter
- B (2) Apply B filter
- C (38) Apply C filter
- D (6) Apply D filter
- E (51) Apply E filter
- F (72) Apply F filter
- H (18) Apply H filter
- I (6) Apply I filter
- L (7) Apply L filter
- M (10) Apply M filter
- N (5) Apply N filter
- O (2) Apply O filter
- P (8) Apply P filter
- Q (2) Apply Q filter
- R (7) Apply R filter
- S (56) Apply S filter
- T (11) Apply T filter
- U (1) Apply U filter
- V (3) Apply V filter
- W (6) Apply W filter
This is the Corporate policy on attendance and NTPC's commitment to manage employee absenteeism in a fair and consistent manner.
This policy assigns responsibilities and duties for authorizing and managing the NTPC bank accounts.
NTPC transformer and fuel tank berms shall be emptied of water regularly to ensure suitable capacity in the event of a spill. Download...
User manual for the Guide Ti system related to Asset Management within CMMS. Presented during NTPC training sessions.
User manual for the Guide Ti system related to scheduling, approving and managing Work Orders. Presented during NTPC training sessions...
User manual for the Guide Ti system related to Work Executor role and work order completion documenting. Presented during NTPC training...
User manual for the Guide Ti system related to creating Work Requests. Presented during NTPC training sessions.
Process steps and support network for this specific CMMS Role.
Process steps and support network for this specific CMMS Role.