Forms & Documents

×

Error message

  • Deprecated function: Return type of FacetapiFacet::offsetExists($offset) should either be compatible with ArrayAccess::offsetExists(mixed $offset): bool, or the #[\ReturnTypeWillChange] attribute should be used to temporarily suppress the notice in include_once() (line 1135 of /home/ntpc/intra-ntpc.dev.outcrop.com/sites/all/modules/facetapi/plugins/facetapi/adapter.inc).
  • Deprecated function: Return type of FacetapiFacet::offsetGet($offset) should either be compatible with ArrayAccess::offsetGet(mixed $offset): mixed, or the #[\ReturnTypeWillChange] attribute should be used to temporarily suppress the notice in include_once() (line 1135 of /home/ntpc/intra-ntpc.dev.outcrop.com/sites/all/modules/facetapi/plugins/facetapi/adapter.inc).
  • Deprecated function: Return type of FacetapiFacet::offsetSet($offset, $value) should either be compatible with ArrayAccess::offsetSet(mixed $offset, mixed $value): void, or the #[\ReturnTypeWillChange] attribute should be used to temporarily suppress the notice in include_once() (line 1135 of /home/ntpc/intra-ntpc.dev.outcrop.com/sites/all/modules/facetapi/plugins/facetapi/adapter.inc).
  • Deprecated function: Return type of FacetapiFacet::offsetUnset($offset) should either be compatible with ArrayAccess::offsetUnset(mixed $offset): void, or the #[\ReturnTypeWillChange] attribute should be used to temporarily suppress the notice in include_once() (line 1135 of /home/ntpc/intra-ntpc.dev.outcrop.com/sites/all/modules/facetapi/plugins/facetapi/adapter.inc).
Published: February 19, 2016

Conducted to assess the implementation of the Project Safety Plan.

Published: February 19, 2016

List of safety requirements contractors must follow.  

Published: February 19, 2016

An assessment of the contractor’s safety management programs and past safety performance.

Published: February 19, 2016

Used to assess the contractor's submission of ...

Published: February 19, 2016

Used to conduct an inspection of the contractor at the worksite prior to project work beginning.  Helps to ensure that the contractor is...

Published: February 19, 2016

Completed by the contractor.  Assists in tracking and reviewing contractor performance and in identifying areas requiring corrective...

Published: February 19, 2016

Conducted after project is completed.  Includes a review of:

  • Pre-Start Contractor Inspection.
  • Incidents reported...
Published: February 19, 2016

List of all contractors approved to work for NTPC.  Currently under revision. 

Published: February 19, 2016

Follow the NTPC Contractor Discipline Policy if and when Safe Work Practices and/or Safe Job Procedures are not being followed and/or...

Published: February 19, 2016

A Work Permit is a guarantee of isolation for specific work on specific apparatus.